Golden Stairs Slip Repair

CLIENT
Tamihana Ave

COMPLETION
2025

LOCATION
Kaipara

DURATION
2 Months

SCOPE
Retaining walls, Roading, Earthworks

A significant slip triggered by Cyclone Gabrielle reduced Golden Stairs Road to a single lane, requiring a fast, constructable solution that could be delivered under traffic while managing groundwater and tight access.

Our team delivered a fast, durable solution, after a major slip, restoring stability, keeping residents connected, and overcoming tough ground conditions in winter. It was great to work alongside Oxcon on this project.